Quality
Fakhr links material verification with manufacturing, identification data, and delivery records.


Material identification, material records and upstream verification through Arkan Steel.
INPUT VERIFICATION
INFORMATION CONTROL
Approved drawings, BBS, dimensions, quantities and bar marks issued to fabrication.
TRACEABILITY
Project identity, production tags and delivery records maintained through the process.
Arkan Steel Laboratory
BEND
CHEMICAL
MECHANICAL
GEOMETRY
Chemical analysis
Mechanical testing
Geometry measurement
Bend and re-bend testing
Identify and allocate reinforcement before processing.
01
QUALITY CONTROL
PRECISION CHECKED AT EVERY STAGE
Shape, dimensions, quantity and identification are checked from material allocation to dispatch.
Material identification
Production information
Check project references, bar marks, shapes, dimensions and quantities.
02
03
04
Fabrication setup
Set up production against the approved fabrication information.
First-piece check
Check the initial shape and dimensions before continuing the sequence.
Check the fabricated reinforcement against the required shape.
05
Dimensional inspection
07
Tagging & bundle control
Organize and identify the reinforcement for handling and dispatch.
Quantity control
Confirm processed quantities against the production requirement.
06
08
Final verification
Check bundle identity, release status and delivery documentation.


